Thursday 9 July 2015

Update on settlement and moving in

Spoke to the developer, Ceerose, and here is our 'sad cat' face at hearing about the delays.


They said they had lost time finishing the externals (membranes and public spaces) during the heavy rain, but they continued to make good progress inside.

All owners will receive an email update within a week or two, advising that the 'settlement inspections' will occur before the end of August. This is when all owners have the opportunity to see their apartments, report any problems (there is normally a builder on site) or sign off that they are acceptable.

After that, settlement must occur within 21 days, although if someone is ready to move immediately, then maybe by the end of August if all goes well. But for most, sounds like September.

After moving in, there is a three month warranty on fixtures and fitting (so the pre settlement inspection is not the only chance to fix something), and a six year warranty on the building.

So a bit more patience is required, no doubt they are doing what they can to make progress.

But we want to get on with it!



3 comments:

  1. Elana and Graham,
    Thank you for the update. September is not too far away, fingers crossed all goes well. We went to have a look at HM today and I must say the building looks stunning! There was a lot of activity going on and soil is being put in place for the outside gardens. Big compliments to Ceerose Team, we hope the apartments are as great as the building looks from the outside. Such a grand project. Cheers, Elena

    ReplyDelete
  2. Thanks guys, really useful info

    ReplyDelete
  3. Hey, have any of you received the email update mentioned above?

    ReplyDelete