Saturday 11 July 2015

Landscapers have started, grain elevator house restored


Lots of people on site on a Saturday (11 July). Soil has been brought into the garden on the eastern side, although no sign yet of any planting. Expect this side to become dense shrubs and trees.




The stairway down to the light rail on the 'podium' level has a stylish glass partition, probably separating the public access part from the entry to HM. The stairs have a sloping section where bikes can be pushed up. But not much more progress on the external lift in recent weeks, still surrounded by scaffolding





But the grain elevator house looks finished, now covered in corrugated steel. This was one of the original features that the developer had to restore, and I heard they had to cut back 10 square metres of space from two apartments in the corner. It's a distinctive and attractive feature worth retaining, and it links with the weighbridge below which also should be restored.




3 comments:

  1. Awesome update and thanks for the photos! Slowly but surely coming together - can't wait for the pre-settlement inspections next month!

    ReplyDelete
  2. Wow it surely is happening. Not long to go. I agree with Jono an awesome update. I think Ceerose will have done a mighty job. Once again thanks for the blog and keeping all of us buyers up to date.
    Congratulations.

    ReplyDelete
  3. I did the inspection yesterday and I am super happy with the design !!!!

    ReplyDelete