Tuesday 21 July 2015

Update on garden, road access, graffiti and DH lift

Ok, a few pieces of news.

First, the planting has started, with half a dozen trees in the Eastern garden. According to the landscape plan, another 40 or so shrubs should be added, both along the wall next to the road, and near the brown wall. The new trees will grow very tall over the years.


Second, we've been assured by Ceerose that the graffiti on the wall below the road will be removed or painted over, but only when the building is finished and residents can protect the area.

Third, the new lift into Darling Harbour has been built, about 10 metres past the exiting lift.



A new steel walkway will extend from the near the existing lift entrance across to the new lift.


Finally, Ceerose has clarified how we drive into and out of the carpark. Jones Street is two-way. Cars are not supposed to drive up or down the driveway on the southern side of the building between Jones Lane and Jones Street. It is intended only for pedestrians and the garbage truck.

No comments:

Post a Comment